Ready for the stresses and strains. Today, tomorrow and the day after tomorrow
Globalisation and the associated mass demand for goods from various countries of origin is already leaving its mark on our infrastructure. The situation is expected to worsen in the coming decades, as a huge avalanche of heavy goods vehicles is rolling onto our roads. Good transport services will more than double by the year 2050. This also means a significantly higher dynamic load for the underground infrastructure as well. Our solution: Safe sewer pipe systems for increasing dynamic loads The AWADUKT PP sewer network solution already fulfils future requirements today.
Calculations for your projects
The increasing loads make a verification of the dynamic load-bearing capacity more and more important. We establish the safety margins for the AWADUKT PP system by taking into account all loads, including the dynamic ones, for the first time.
The transported mass increases up to 2050 by 44%.
The path travelled increases by 50%.
An HGV places a load on the road equivalent to 100,000 cars.
In direct comparison, AWADUKT sewer pipe systems made of high-quality polypropylene are clearly superior to other systems. AWADUKT PP has top scores for static and dynamic load-bearing capacity. As a result, AWADUKT PP has up to 250 times higher dynamic load capacity compared to PP pipes with mineral fillers. 30,000 km of the European sewer network is perfectly equipped for the future with AWADUKT PP sewer pipe systems.
Downloads
Documents for download
Instruction manuals, handbooks, technical information, catalogues, price lists and certificates are available for download.
Engineering progress
Enhancing lives
Maximum cart size of 3 items has been reached!