FH-UK-D278 - 16113825

Chilled ceiling

Low temperature chilled ceiling solution.

A chilled ceiling system designed to provide a cost effective and energy efficient cooling for commercial and residential environments.

REHAU CoolBoard consists of a 15mm thick gypsum board backed with 15mm EPS insulation,  with pre-routed grooves to carry 10mm RAUTHERM S PE-Xa pipe work. The panels are supplied pre-assembled with the pipe, along with an extensive range of fittings to secure the boards to the suspended ceiling or joists.

Pipe tails from the boards are connected to a manifold system to the supply of chilled water. The complete system uses high quality RAUTHERM S PE-Xa pipework and REHAU EVERLOCTM fittings.

Unlike chilled beams and other ceiling systems, REHAU CoolBoard fits seamlessly with standard plasterboard ceiling panels in any plasterboard ceiling application. You may not be able to see the chilled ceiling panels from the standard panels, but you'll feel their effect.

REHAU chilled ceiling board REHAU EVERLOC pipe and fittings for coolboard


Advantages

REHAU chilled ceiling offers the following advantages and benefits:

  • Up to 20% lower energy consumption
  • No servicing and maintenance costs
  • No draughts or dust allergens therefore reducing sick building syndrome
  • Uses REHAU EVERLOCTM jointing technology
  • No compromise on planned ceiling height
FH-UK-D276 - 16113706

REHAU EVERLOCTM system

Beyond the REHAU PE-Xa pipe, the jointing system plays a central role. Over 850 million fittings have been installed worldwide, our jointing system consists of only two components; a compression sleeve and fitting.

Benefits:

  • Fast and easy to install
  • No hot works on site, no mess
  • 10 year comprehensive warranty
  • No O-ring
  • Installation is immediately able to handle pressure loads


REHAU chilled ceiling and EVERLOC joint
FH-UK-D404 - 12144152

Manifold boxes

  • Insulated manifold boxes with project specific design
  • Clearly labelled for ease of installation
  • Removable, insulated lid
  • Pre-cut pipe inserts aligned with individual ports
  • Test points on each port

Downloads

Projects

News

6 - Sustainable construction Wall Assembly HiREs - 1122843
27.02.2025 Modern Methods of Construction – A Scalable Way Forward

The UK needs more buildings, but there’s less space to work with than on the continent, alongside skills shortages in the construction sector. So, what do we do? Offsite construction methods offer a way to build high-quality properties, quickly.

U35-D050_CL - 100075680
13.02.2025 100% climate neutral sewer system

REHAU has launched its first 100% climate neutral plastic sewer system, nevoPP, which has a completely measurable climate impact throughout the entire product life cycle.

kiwa-logo-block - 100071786
14.11.2024 Demystifying drinking water approval

Two years on from REHAU’s change over to a KIWA UK reg4 certification there are still many common misconceptions for drinking water approval. 

Engineering progress

Enhancing lives

Maximum cart size of 3 items has been reached!

Your sample cart items:
Type
Decor
Collection