467-D021 - 100044204

District heating: low carbon heat supply

 

Heat networks, fed by renewable energy and waste heat, are key to low carbon heat supply. As a polymer specialist, we offer decades of expertise, comprehensive planning and construction site service and a pre-insulated pipe system with up to 70% longer service life. 

ZCEI_00547_01_EN - 100077965

Why district heating?
Compared to supplying individual buildings, heat from renewable energies and waste heat can be provided much more cost-effectively using heating networks. New heat sources and innovative technologies can simply be integrated centrally, resulting in an economic and sustainable heat supply.

Our unrivalled expertise means that we can provide advice and support for your district heating network projects from the planning stage to realisation.

IGT_0707 - 1120799

Polymer pre-insulated pipe systems for district heating 

 

Why polymer pipe systems?

Polymer pipe systems offer a number of advantages – first and foremost in terms of flexibility. Obstacles in the pipe trench, such as crossing sewer pipes or chambers, can be simply bypassed without the need for additional joints and prefabricated parts. The systems use a simple and robust jointing system, which can be easily installed. Compared to steel, there is also no risk of corrosion damage to the pipework or the need to install expansion joints. Ultimately, polymer pipe systems can save you time and money!

Polymer pipe system on a construction site
Polymer pipe system on a construction site

 

Network connections

For heat networks the jointing technique is one of the crucial factors for safety, workability and cost-effectiveness. Our solution: the compression sleeve jointing technique developed by REHAU. The EVERLOC jointing system, utilises two components and has been installed over 1 billion times worldwide offering users a reliable system with up to 50% faster connections.

We have two established systems tailored to the RAUTHERMEX, RAUVIPEX and RAUVITHERM pipe systems to reliably re-insulate the connection: a heat-shrink shroud system and the tried-and-tested REHAU clip system. A new addition to the range is the CLIP-FLEX universal shroud system, which requires no hot works and offers more design flexibility.

The necessary I, T and L sleeves are available for all systems.

CLIP-FLEX shroud

 

Why REHAU

With more than 40 years of experience in the development and manufacture of PE-Xa pipes, we have unique expertise and innovative, tested system solutions. REHAU has had an accredited laboratory at its Erlangen site since 1979 and is ISO 9001 certified. Our 360-degree service supports the planning and implementation of heat networks. This includes, for example, a detailed pipe network and heat loss calculation, including hydraulic optimisation, as well as instruction and training on the construction site, including the provision of tools and installation aids.

  • Three pre-insulated systems with maximum flexibility and excellent insulation
     
  • Tried and tested compression sleeve press connection
     
  • Sleeve system Tight even under extreme loads

     

 

Trends in District Heating Pipework

This whitepaper aims to provide district heating specifiers and contractors with key considerations and technical points for the next generation of low carbon heat networks. 

Thank you for downloading the Trends in District Heating Pipework Whitepaper.

Unfortunately an error has occurred. Please try again.

An error occured, please try again later. (Form was not sent!)

By submitting in this form, I agree to being contacted and receive emails about product offering, new features & services, events, inspiration, downloads and emails from REHAU. I can revoke my permission at any time.

REHAU_Trends in District Heating Pipework_Front_Page - 1092521

News

6 - Sustainable construction Wall Assembly HiREs - 1122843
27.02.2025 Modern Methods of Construction – A Scalable Way Forward

The UK needs more buildings, but there’s less space to work with than on the continent, alongside skills shortages in the construction sector. So, what do we do? Offsite construction methods offer a way to build high-quality properties, quickly.

U35-D050_CL - 100075680
13.02.2025 100% climate neutral sewer system

REHAU has launched its first 100% climate neutral plastic sewer system, nevoPP, which has a completely measurable climate impact throughout the entire product life cycle.

kiwa-logo-block - 100071786
14.11.2024 Demystifying drinking water approval

Two years on from REHAU’s change over to a KIWA UK reg4 certification there are still many common misconceptions for drinking water approval. 

Engineering progress